The Britwind H15 Wind Turbine is sited on the south west side of Rutherford Appleton Laboratory in its own compound.
The H15 Class IV wind turbine was erected at RAL in February 2018, and commissioned on the 22nd February. . It is a modern horizontal-axis up-wind machine with a tower height of 18m and a 3-bladed rotor with a 13.1m diameter, and has a rated power of 12kW. The blades are fixed pitch and the rotor operates at variable speed, optimising energy production at low wind speeds. Therefore it is suitable for supporting research projects at RAL that require electricity generation from a renewable energy source.
The power in the wind increases rapidly with increasing wind speed. A power curve is generally used to characterise wind turbine performance, with significant points on the curve at the cut-in wind speed (around 3 - 4 m/s, when the wind turbine starts to generate), the rated wind speed (about 12 m/s above which the output power is regulated to the rated power), and the cut-out wind speed (about 14 m/s when the wind turbine starts to be shut down for safety and to avoid excessive stress).
The H15 wind turbine was manufactured and installed on the RAL site by Britwind: http://www.britwind.co.uk/
Month of Life | Date | Power since last reading (approx. monthly) | Running Total |
---|---|---|---|
0 | 22/02/18 | 0 | 0 |
1 | 22/03/18 | 2661 kWh | 2661 kWh |
2 | 22/04/18 | 2719 kWh | 5380 kWh |
3 | 22/05/18 | 1315 kWh | 6695 kWh |
4 | 22/06/18 | 1151 kWh | 7846 kWh |
5 | 22/07/18 | 626 kWh | 8472 kWh |
No production due to fault | |||
12 | 18/01/19 | Limited production | 9068 kWh |
13 | 17/02/19 | 2838 kWh | 11,906 kWh |
14 | 26/03/19 | 3182 kWh | 15,088 kWh |
15 | 23/04/19 | 527 kWh | 15,615 kWh |
16 | 21/05/19 | 747 kWh | 16,362 kWh |
It is believed the service visit on 6/6/2019 has fixed a longstanding fault | |||
17 | 18/06/19 | 1179 kWh | 17,541 kWh |
18 | 18/07/19 | 918 kWh | 18,459 kWh |
19 | 21/08/19 | 2735 kWh | 21,194 kWh |
20 | 24/09/19 | 1055 kWh | 22,989 kWh |
21 | 23/10/19 | 2316 kWh | 25,305 KWh |
22 | 20/11/19 | 3631 kWh | 27,136 kWh |
23 | 19/12/19 | 2797 kWh | 29,933 kWh |
24 | 22/01/20 | 3145 kWh | 33,078 kWh |
25 | 22/02/20 | 1815 KWh | 34,893 KWh |
26 | 18/03/20 | 2297 KWh | 37,190 KWh |
27 | 22/04/20 | 1588 KWh | 38,778 KWh |
28 | 13/05/20 | 529 kWh | 39,307kWh |
29 | 19/06/20 | 1569 kWh | 40,867 kWh |
30 | 24/07/20 | 2272 kWh | 43,139 kWh |
31 | 26/08/20 | 2210 kWh | 45,349 kWh |
32 | 23/09/20 | 1149 kWh | 46,498 kWh |
33 | 19/10/20 | 1948 kWh | 48,446 kWh |
34 | 24/11/20 | 3671 kWh | 52,117 kWh |
35 | 21/12/20 | 2491 kWh | 54,608 kWh |
36 | 19/01/21 | 620 kWh | 55,228 kWh |
37 | 26/02/21 | 4273 kWh | 59,501 kWh |
38 | 30/03/21 | 2468 kWh | 61,969 kWh |
39 | 21/04/21 | 917 kWh | 62,886 kWh |
40 | 21/05/21 | 1917 kWh | 64,803 kWh |
41 | 28/06/21 | 1103 kWh | 65,906 kWh |
42 | 22/07/21 | 723 kWh | 66,629 kWh |
43 | 25/08/21 | 1887 kWh | 68,516 kWh |
44 | 23/09/21 | 652 kWh | 69,168 kWh |
45 | 19/10/21 | 1937 kWh | 71,105 kWh |
46 | 24/11/21 | 2175 kWh | 73,280 kWh |
47 | 22/12/21 | 2149 kWh | 75,429 kWh |
48 | 28/01/22 | 2575 kWh | 78,004 kWh |
49 | 21/02/22 | 2791 kWh | 80,795 kWh |
50 | 21/03/22 | 3127 kWh | 83,922 kWh |
51 | 19/04/22 | 1535 kWh | 85,457 kWh |
52 | 24/05/22 | 1482 kWh | 86,939 kWh |
53 | 24/06/22 | 1295 kWh | 88,234 kWh |
54 | 22/07/22 | 1502 kWh | 89,736 kWh |
55 | 23/08/22 | 1195 kWh | 90,931 kWh |
56 | 20/09/22 | 1312 kWh | 92,243 kWh |
57 | 25/10/22 | 2507 kWh | 94,750 kWh |
58 | 22/11/22 | 2922 kWh | 97,672 kWh |
59 | 22/12/22 | 1580 kWh | 99,252 kWh |
60 | 24/01/23 | 3180 kWh | 102,432 kWh |
61 | 21/02/23 | 1894 kWh | 104,326 kWh |
62 | 21/03/23 | 1781 kWh | 106,107 kWh |
63 | 25/04/23 | 2925 kWh | 109,032 kWh |
64 | 25/05/23 | 1372 kWh | 110,404 kWh |
65 | 19/06/23 | 954 kWh | 111,358 kWh |
66 | 21/07/23 | 1907 kWh | 113,265 kWh |
67 | 30/08/23 | 2585 kWh | 115,850 kWh |
68 | 20/09/23 | 432 kWh | 116,292 kWh |
69 | 30/10/23 | 2726 kWh | 119,018 kWh |
70 | 01/12/23 | 2367 kWh | 121,385 kWh |
71 | 01/01/24 | 805 kWh | 122,190 kWh |
No production due to fault. Fault Cleared on 27th May 2024 and Turbine back operational | |||
72 | 13/06/24 | 1417 kWh | 123,607 kWh |
73 | 01/07/24 | 681 kWh | 124,288 kWh |
74 | 01/08/24 | 1339 kWh | 125,627 kWh |
75 | 02/09/24 | 2140 kWh | 127,767 kWh |
76 | 01/10/24 | 1497 kWh | 129,264kWh |
77 | 01/11/24 | 1808 kWh | 131,072kWh |
78 | 02/12/24 | 1764 kWh | 132,836kWh |
79 | 06/01/25 | 2619 kWh | 135,455kWh |
80 | 03/02/25 | 1748 kWh | 137,203kWh |
81 | 03/03/25 | 2115 kWh | 139,318kWh |
82 | 07/04/25 | 1842 kWh | 141,160kWh |